Project Type:
Public Infrastructure
Project Location:
Pirque, Santiago, Chile
Project Summary:
AT-PAC continues to provide complete scaffolding solutions worldwide. Since the beginning of March of 2018, the construction of six water storage tanks in Santiago has been underway. Our client was in need of a suspended scaffolding structure that would withstand vibration. Scaffold structures were also needed for the installment of water elevators and the assembly of pipes up to 3m in diameter. AT-PAC had the solution to each obstacle encountered during this project. At 40m deep, this project can hold and supply 1,500,000 cubic meters of water within 36 hours to the residents in Santiago.
Customer Challenges:
Due to the excavation process occurring simultaneously as the erection of the scaffold, a suspended scaffold structure was necessary. The structure had to be free of vibrations to ensure a safe working environment for all parties involved.
AT-PAC Solution:
Impact:
For stage scaffolding rentals, please contact one of our friendly consultants for more information.
GLOBAL HQ
Atlantic Pacific Equipment LLC (AT-PAC).
1455 Old Alabama Road Ste. 100
Roswell, GA 30076 USA
DISCLAIMER: The information contained in this website is provided by Atlantic Pacific Equipment, LLC (“AT-PAC”) and is for general information purposes only.
Atlantic Pacific Equipment (AT-PAC), LLC All Rights Reserved
Atlantic Pacific Equipment (AT-PAC), LLC All Rights Reserved